Blue Area, Islamabad | Est. 1994 | PEC CA No Limit051-873-3067info@afccoservices.com

Services

Field construction, civil works and infrastructure support.

AFCCO delivers the physical works that support drilling campaigns, production facilities, government buildings and institutional infrastructure.

Service Lines

Six delivery workstreams, with quality and HSE built into every package.

Each workstream can be estimated independently or combined into a coordinated civil and infrastructure package.

Onshore drilling rig at a prepared well location

Field Development

01

Oil & Gas Field Services

Specialized civil support for E&P blocks and remote drilling locations.

  • Well location preparation
  • Rig move support works
  • Production facility civil works
02

Well Site Construction

Preparation of the physical site before drilling and field operation.

  • Earthworks and compaction
  • Rig foundations and cellars
  • Mud pits and drainage works
AFCCO access and site-preparation works Completed AFCCO civil building and external development

Access & Infrastructure

03

Access Roads & Camps

Field logistics infrastructure for crews, equipment and operations.

  • Road construction and restoration
  • Camp and accommodation facilities
  • Utilities, fencing and boundary works
04

Government & Commercial

RCC, finishing and external development for institutional projects.

  • Multi-storey buildings
  • Sports complexes and stadiums
  • External development and landscaping
Inspection of industrial mechanical equipment

Plant & Building Systems

05

Mechanical & Piping

Support works for plant, pipeline, structural and facility packages.

  • Pipeline installation support
  • Structural steel fabrication
  • HVAC and fire fighting systems
06

Electrical & ELV

Power, lighting and control-related support for field and building sites.

  • HV and LV distribution
  • Generator and UPS installation
  • External road lighting

Controls Across Every Package

Inspection discipline and safe execution are part of the delivery model.

07

Quality Management

Documented controls for inspection, testing and closeout.

  • ITPs and method statements
  • NCR tracking and resolution
  • Project documentation
08

HSE Management

Site controls aligned with ISO 45001 and client requirements.

  • Toolbox talks and inductions
  • Risk assessments
  • Emergency preparedness

Execution Model

From site visit to mobilization and closeout.

AFCCO's delivery model is designed around field constraints: remote access, schedule pressure, client HSE expectations, equipment movement and documentation.

01

Site Review

Scope confirmation, site condition review and constraint mapping.

02

Planning

Method statements, HSE plan, manpower, equipment and material planning.

03

Mobilization

Field teams, plant, materials and supervision mobilized to site.

04

Execution & Closeout

Progress controls, inspection, punch list and client handover documentation.

Need a Contractor?

Send AFCCO your project scope or prequalification request.